Installation methods of external exterior and outdoor lighting system includes lighting equipment luminaires control gears panel boards poles brackets cabling and allied minor civil works.
Light pole installation method statement.
All installations are to be carried out under strict supervision of qualified supervisors and engineers.
Set up to be symmetrical about the pole axis to.
Led street light pole installation procedure there are 6 in stallation procedures of led street lamp pole for your reference.
The contractor shall only use equipment rated for such weight.
Anchor bolts are the most commonly used method to secure poles to concrete foundations.
5 once the pole is lowered into place resting on the dumpy levelling nuts maintain the strain on the pole and using one of the spanners adjust the dumpy.
Base for 25 35 pole is 680 kg.
This method statement is to define the method to be used to ensure that the street light fittings are dismantled and installed correctly and acceptable and shall conform to the contract documents and specification.
A particular set up is shown in figure 1.
Firstly we contact with the departments of the pipeline to understand the approximate distribution of underground cables and knowing the detailed division of underground pipelines through excavation channels.
Pole assembly installation for street light poles figure 1.
Deliver components parts to site completely identified in accordance with shop and certified drawings prepared for this work.
Type of lighting fixtures are to be selected as per the approved schedule of lighting and approved shop drawing.
By manual method prior to lowering the pole have one of the installation crew rotate the pole to match the position of the bolts and gently lower the pole maintaining alignment.
This guide covers the installation of light poles.
If installation required heavy vehicles extreme care has to be taken for preventing damages of.
Power and lighting system for the whole building.
Ensure all finishing works in all related areas are completed for the area of installation and released cleared by civil section to proceed on with the installation of lighting fixtures.
E16 22 street light poles and arms e16 22 1 the contractor shall handle store and transport the poles and arms in a manner to prevent damage.
Anchor bolts are specifically manufactured for pole foundations and each pole requires anchor bolts of an exact diameter and length.
With the pole axis as any eccentric loading may result in a misaligned joint and or may damage the pole sections due to the additional bending stresses.
Installation guidelines 091015 1 installation guidelines for sports high mast lighting structures the following information is intended as a guide for the installing contractor.
Dismantle existing pole lantern and feeder pillar.